Bidding for renovation properties at auction
For more information, see the main article about Renovation.
The term ‘renovation’ refers to the process of returning something to a good state of repair. In the construction industry, renovation refers to the process of improving or modernising an old, damaged or defective building.
It is common that buildings requiring renovation work are sold at auction.
Bidding for renovation works can be daunting, and careful preparation should be undertaken to be sure that the project has a chance of being both feasible and profitable should the bid be successful.
It is sensible to sit in on a different auction before attending the auction for the property of interest. This is useful in order to get an understanding for how the process works. The property itself should be thoroughly researched before the auction, to avoid the chances of being surprised by potentially costly issues post-purchase.
The regular conveyancing work should be commissioned in order to check the site boundaries, titles and raise any questions with the vendor’s solicitor. It might be deemed worthwhile to commission a full survey. However, this will all involve a financial investment prior to the auction, which may not result in a purchase, so the process should not be undertaken lightly.
Financial arrangements will need to be in place before the auction, to ensure the required 10% deposit is available on the day of the auction when, if successful, contracts will be signed. The remaining 90% is usually required within 28 days. It will be necessary to check the required payment methods of the auctioneers to ensure compliance.
It is also worth having a ‘ceiling’ amount that represents the maximum figure that will be bid on the property, to avoid getting carried away on the day and committing to a higher amount.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February